I am an IT dink, so I am hoping someone here can lend me an assist on the concept of `head`. We are settling on a piece of acreage in a couple of weeks an I will install an AP system. Now the property has spots where there is a 1-1.5m down slope I would like to take advantage of. However I don't want to run 30m of wiring to the bottom slope sump to power the pump. Rather I would prefer to place the FT next to the shop with the pump taking advantage of the electrical already in place. Then have